The redevelopment and beautification of the Bridgewater Foreshore Precinct Stage 1 was completed in 2019. Urban Design Group supplied ST30 Albert seats, PS370 Lindburn picnic settings and BN460 bin surrounds.
All furniture was manufactured with our low maintenance recycled composite slats in Walnut. The bin surrounds feature a laser cut platypus in the door as a nod to the local inhabitants!
Gallery
Holiday Office Closure Notice
Our office will be closed from 12pm, 20th December 2024 and will reopen at 9am, 13th January 2025. Have a safe and happy holiday season.